Long Beach Port Office Trailer Relocation Project

Efficient Relocation of Key Administration Office for Uninterrupted Operations at Long Beach Port

  • Challenge

    The Port of Long Beach needed to relocate an existing mobile office which was in use to another site of theirs. This office unit was one of several administration offices used for cargo operations - retrieval and shipping.

  • Solution

    CSLM assisted in relocation of the mobile office trailer, tearing down the unit and prepping the unit for transport at its original site location and then setting up the unit at the new site location. CSLM did so in several hours, the same day.

  • Result

    CSLM was able to relocate the mobile office with intense focus on the small details and providing high quality service. The Port of Long Beach was able to have their important administration office relocated without any hitch to their service provisions and continue their operations within a single day.